Publications of P. van Eeten
All genres
Journal Article (22)
1.
Journal Article
: Overview of the first Wendelstein 7-X long pulse campaign with fully water-cooled plasma facing components. Nuclear Fusion 64, 112002 (2024)
2.
Journal Article
: Preparing the operation of Wendelstein 7-X in the steady-state regime. Fusion Engineering and Design 193, 113830 (2023)
3.
Journal Article
: Experimental confirmation of efficient island divertor operation and successful neoclassical transport optimization in Wendelstein 7-X. Nuclear Fusion 62, 042022 (2022)
4.
Journal Article
: Operation of W7-X with an Inertially Cooled Divertor – On the Way to Steady State Operation. IEEE Transactions on Plasma Science 48 (6), pp. 1369 - 1375 (2020)
5.
Journal Article
30 (4), 4202905 (2020)
Cyclic Behavior of Wendelstein 7-X Magnet System During First Two Phases of Operation. IEEE Transactions on Applied Superconductivity 6.
Journal Article
159, 111843 (2020)
Organizing Wendelstein 7-X device operation. Fusion Engineering and Design 7.
Journal Article
48 (7), pp. 2635 - 2638 (2020)
Commissioning of the Wendelstein 7-X in Vessel Control Coils. IEEE Transactions on Plasma Science 8.
Journal Article
: W7-X NBI beam dump thermocouple measurements as safety interlock. Fusion Engineering and Design 146, Pt. A, pp. 1329 - 1333 (2019)
9.
Journal Article
: The new W7-X logbook – A software for effective experiment documentation and collaborative research at Wendelstein 7-X. Fusion Engineering and Design 146, Pt. A, pp. 1254 - 1257 (2019)
10.
Journal Article
: Overview of first Wendelstein 7-X high-performance operation. Nuclear Fusion 59, 112004 (2019)
11.
Journal Article
: Engineering Challenges in W7-X: Lessons Learned and Status for the Second Operation Phase. IEEE Transactions on Plasma Science 46 (5), pp. 1131 - 1140 (2018)
12.
Journal Article
46 (5), pp. 1086 - 1094 (2018)
Mechanical Monitoring Issues in Preparation to Next Step of Wendelstein 7-X Operation. IEEE Transactions on Plasma Science 13.
Journal Article
: Final integration, commissioning and start of the Wendelstein 7-X stellarator operation. Nuclear Fusion 57, 116015 (2017)
14.
Journal Article
72 (4), pp. 546 - 558 (2017)
Engineering Challenges of W7-X: Improvement of Numerical Modeling and Mechanical Monitoring After Commissioning and First Phase of Operation. Fusion Science and Technology 15.
Journal Article
123, pp. 91 - 96 (2017)
Monitoring of W7-X cryostat commissioning with cryostat system FE model. Fusion Engineering and Design 16.
Journal Article
: Major results from the first plasma campaign of the Wendelstein 7-X stellarator. Nuclear Fusion 57, 102020 (2017)
17.
Journal Article
44 (9, Part 1), pp. 1722 - 1730 (2016)
Structural Analysis at the Transition from W7-X Construction to Operation. IEEE Transactions on Plasma Science 18.
Journal Article
: Experience with the commissioning of the superconducting stellarator Wendelstein 7-X. Fusion Engineering and Design 96-97, pp. 22 - 27 (2015)
19.
Journal Article
96-97, pp. 369 - 372 (2015)
Features and analyses of W7-X cryostat system FE model. Fusion Engineering and Design 20.
Journal Article
42 (3), pp. 690 - 697 (2014)
Specific Features of Wendelstein 7-X Structural Analyses. IEEE Transactions on Plasma Science